MH Earthmoving: Bangus Quarry Detailed Design & EIS Preparation
Bangus Quarry EIS Preparation & Detailed Design
Client: MH Earthmoving Pty Ltd
Discipline: Waste & Resource Management
Date: March 2019 onwards
InSitu Advisory have been commissioned to undertake an Environmental Impact Statement (EIS) for a proposed general solid waste (non-putrescible) waste facility in south western NSW. InSitu Advisory, working with a team of specialist experts, are assessing all environmental and social impacts and in the preparation of the EIS.
InSitu Advisory have undertaken the detailed design for the facility and associated infrastructure converting an exhausted quarry into a proposed landfill facility. The detailed design and CQA Plan are in full accordance with the NSW EPA Environmental Guidelines, Solid Waste Landfills, 2016